Track Flyover Crossing Tile
The line crossing itself: a plain length of main line running through at ground level, and a second railway carried over it at right angles on a single segmental arch between two battered stone abutments. The soffit is set to clear the tallest vehicle in the pack with a trackbed to spare, so a full-height coach runs under it and out the far side. Reach the deck with a gradient ramp and a high ramp at each end.
- triangles
- 3,252
- compressed
- 19 KB
- formats
- 2
triangles
compressed
formats