Low-Poly Spoil Mound 3D Model (GLB)
The heaped earth the excavator pulled out: damp dark clods slumped at the toe drying to a pale crust on a broken crest, bucket-shaped tip lines ridged down the flank and a shovel left standing in the top. Doubles as the pack’s `ground_cover` bulk — heap it anywhere the dig has been.
- triangles
- 1,652
- compressed
- 15 KB
- formats
- 2
triangles
compressed
formats